Skip to content
LED Exit Signs Sourcing

Independent sourcing partner for led exit sign programs

Quote Checklist

die-cast led exit sign

Normalize quote scope before selection. Confirm legend appearance, mounting parts and model identification against the schedule. Leave project approval and emergency-system assessment with the responsible qualified parties. Tie the acceptance record to the proposed die-cast led exit sign model and quotation revision.

Quote-scope checklist

Die-cast housings are compared on the same face arrangement, canopy hardware and backup configuration. A thermoplastic stencil or an edge-lit acrylic panel can look similar in a photo and still be a different construction. Do not treat a series brochure as the quoted option code. This page does not publish numeric factory prices.

One specification

Record the exact configuration behind each offer: letter color, single or double face, mounting kit, input voltage (confirm the quoted V AC range on that model; a 120–277 V note on a similar series is not automatic) and whether battery backup minutes are stated. If a bidder proposes a painted steel body instead of die-cast, keep that as a named alternative rather than an unnamed equal.

Product basis
Housing construction, legend method, face count, chevron kit, canopy and whether combo heads are included. Ask which listing or test records belong to this model, not to a neighboring family. UL emergency-lighting evaluation, when required by the project, is product evidence from the supplier path; it is not a badge this website issues. DesignLights Consortium listings, where someone mentions them, are performance lists and do not replace safety documents or create a rebate promise here.
Order basis
Quantity, units, mixed-color packing, a requested case of 4 if that is how the buyer wants cartons, and which spare faces or extra canopies ship. Sample charges stay off the production total unless both sides write them in.
Cost basis
Currency, trade terms, freight, taxes and service fees as quoted. Totals that omit destination freight cannot be ranked against delivered offers. Optional target budget is a buyer preference with currency and unit or order basis; it is not a published discount from this site.

Supply and backup configuration should appear on the same revision as the housing. If minutes, charger type or dual-circuit AC are still blank, the quote is not complete enough to approve. Unresolved model documents stay on the open list. Catalog prompts live on fixtures; carton matching is described under sourcing.

Attach this checklist to the factory request

Send the die-cast configuration, open document items and destination together so replies can share one revision identity.